Back
Map
Road Conditions
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.
Check the roadworks in detail for information, including the planned times of the obstructions.
349
From:
Louiseville
To:
Saint-Paulin
349
Drilling In Saint-Paulin, between route 350 (rang Renversy) and rue Laflèche (rue Lottinville). Alternating traffic between 8 a.m. and 5 p.m.
349
Structural repair In Saint-Paulin, on Rang Beauvallon, at the Baribeau bridge located above the Loup River. In one direction at a time. Alternating traffic, Monday to Thursday, between 7 a.m. and 5 p.m. Track width reduced to 3.65 meters.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use