Back
Map
Road Conditions
Laurentides—Lanaudière
Sorel-Tracy - Saint-Ignace-de-Loyola: Ferries from Saint-Ignace-de-Loyola depart on the hour and from Sorel-Tracy at half past the hour until mid-November. Cause: 1 ferry in operation. Visit the Société des traversiers du Québec website. Ferry service : Open.
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
335
From:
Junction of highway 19 and route 335 in Laval
To:
Bois-des-Filion
335
A-19 Extension Between Laval and Bois-des-Filion, on the Athanase-David Bridge Contraflow traffic, on the southbound carriageway, 1 lane in each direction From Sunday 9 p.m. to Monday 5 a.m.
335
Works: renovation of public services In Saint-Calixte In both directions Between Rue Beauchamps and Rue Duvalière Est Complete closure, at all times Detour: via Rue Principale, Montée Pinet and Rue Antoine-Mantha Trucks: R-337 and R-125
Laval
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
335
From:
Junction of highway 19 and route 335 in Laval
To:
Bois-des-Filion
335
A-19 Extension Between Laval and Bois-des-Filion, on the Athanase-David Bridge Contraflow traffic, on the southbound carriageway, 1 lane in each direction From Sunday 9 p.m. to Monday 5 a.m.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use