Back
Map
Road Conditions
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
265
Bridge reconstruction At Notre-Dame-de-Lourdes, at the bridge located over the Bécancour river. In one direction at a time Vehicles Alternating traffic, at all times. Occasional bridge closures for a period of approximately 15 minutes. Between 10 p.m. and 5:30 a.m. the following day. Pedestrians and cyclists. Bridge closed, shuttle service running from 7am to 10pm. Track width reduced to 3.6 meters. Overloaded vehicles prohibited. Left turn towards Rang Saint-Louis Est prohibited.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use