Back
Map
Road Conditions
Montréal
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
19
Works: bridge repair Between Montreal and Laval, the Papineau-Leblanc Bridge In both directions Closure of 1 lane of 3 at all times
Laval
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
19
Between Montreal and Laval, between Henri-Bourassa and De la Concorde East Boulevards, including the Papineau-Leblanc Bridge In both directions Closure of 1 lane out of 3, at all times Works: repair of the structure
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use