Back
Map
Road Conditions
Estrie
161
Works: Bridge repair In Saint-Augustin-de-Woburn On Rang Clinton Bridge over the Arnold River In both directions Alternating traffic at all times Lane width at 5 meters
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.
Check the roadworks in detail for information, including the planned times of the obstructions.
161
Drilling In Saint-Valère and Saint-Samuel, between the 12th Rang (Saint-Valère) and the Rang des Chênes (Saint-Samuel). Alternating traffic, 1000 meters at a time, between 7 a.m. and 6 p.m.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use