Back
Map
Road Conditions
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.
Check the roadworks in detail for information, including the planned times of the obstructions.
159
Slope stabilization In Sainte-Anne-de-la-Pérade, between Petit-Sainte-Marie row and route 354. Alternating traffic at all times. Between building number 280 and building number 630. Track width reduced to 5 meters.
159
Culvert reconstruction In Saint-Prosper-de-Champlain, on Rang Saint-Augustin, near Route Pronovost. Alternating traffic at all times.
159
Structural maintenance In Saint-Tite, on the Haut-du-Lac Sud row, at the bridge located over the Mékinac du Sud River. Alternating traffic between 10 a.m. and noon.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use