Québec 511
  • Back
  • Map

Road Conditions

    Laurentides—Lanaudière

    • Alternating traffic R-343 at height rivière L'Assomption, SOUTHBOUND and NORTHBOUND, Saint-Paul, undetermined period. Reason : Inspection.
    • Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection.
    • Louis-Hippolyte-La Fontaine tunnel

      Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
    • 158 Road resurfacing In Sainte-Sophie and Saint-Lin-Laurentides between rue des Champs and R-335 In one direction at a time Alternating traffic Tuesday to Thursday between 6 p.m. and 6 a.m. the following day
    • 158 Road resurfacing In Sainte-Sophie, between the Chemin de Val-des-Lacs and the Montée Morel Alternating traffic, Sunday to Thursday between 7 p.m. and 6 a.m. the following day
    • 158 Securing the structure At Sainte-Geneviève-de-Berthier, on the bridge over the North Channel WESTBOUND Lane width reduced to 3.2 meters ----- Monday, May 25 and Tuesday May 26, between 7 a.m. and 5 p.m. Alternating traffic
    • Current Warnings
    • Road Conditions
    • Traffic Cameras
    • Who can consult this page?
    • Français
    • Terms of use