Back
Map
Road Conditions
Current Warnings
Closure Pont Jacques-Cartier between Longueuil and Montréal, WESTBOUND and EASTBOUND, From July 12, 2026 at 8 p.m. to July 12, 2026 at 11:59 p.m., detour Autres ponts. Reason : Special events.
Laurentides—Lanaudière
Alternating traffic R-343 at height rivière L'Assomption, SOUTHBOUND and NORTHBOUND, Saint-Paul, undetermined period. Reason : Inspection.
Contraflow traffic rue Baby on the bridge, 1 lane in each direction. Lane width: 3.2 meters, WESTBOUND and EASTBOUND, Joliette, undetermined period. Reason : Inspection.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
15
Road reconfiguration In Sainte-Thérèse, take exit 23 (Saint-Charles Street) NORTHBOUND Exit closed Friday between 10 p.m. and 6 a.m. the following day Saturday between 10 p.m. and 7 a.m. the following day Sunday between 9:30 p.m. and 5 a.m. the following day Detour Exit 31, Charles Street, A-15 SOUTH
15
Road reconfiguration In Mirabel, take exit 35 (A-50, R-117) NORTHBOUND Exit closed Friday between 10 p.m. and 6 a.m. the following day Saturday between 10 p.m. and 7 a.m. the following day Detour: Exit 39, R-158, A-15 SOUTH
15
Road reconfiguration In Mirabel, between Charles Street and Highway 50 NORTHBOUND Closure of 3 out of 4 lanes Friday between 10 p.m. and 6 a.m. the following day Saturday between 10 p.m. and 7 a.m. the following day
15
Road reconfiguration In Blainville, access is from Boulevard de la Seigneurie SOUTHBOUND Access closed Detour A-15 NORTH, exit 28, Notre-Dame Road
15
Road reconfiguration In Blainville, at the level of Boulevard de la Seigneurie NORTHBOUND Closure of 2 out of 4 lanes
15
Road reconfiguration In Blainville, the exit 25 (Boulevard de la Seigneurie) SOUTHBOUND Exit closed Detour Exit 23, Saint-Charles Street, A-15
15
Road reconfiguration In Mirabel, between Highway 50 and Rang Sainte-Marie NORTHBOUND Closure of 2 out of 3 lanes
15
Road reconfiguration In Mirabel, access from Highway 50 West to Highway 15 North NORTHBOUND Access closed Detour A-15 SOUTH, exit 31, Charles Street
15
Road reconfiguration In Mirabel, access from Highway 50 East to Highway 15 North NORTHBOUND Access closed Detour via Route 117 North and Lachapelle Boulevard
15
Manual patching In Saint-Jérôme, between Rue de Martigny and Boulevard Grand-Héron Heading South Closure of 2 out of 3 lanes
15
Paving In Sainte-Anne-des-Lacs, access via Montée Sainte-Thérèse for Highway 15 South Access closed Detour via Montée Ste Thérèse, rue Louis Morin, R-117 South
Montérégie
Closure R-136 between rue de la Montagne and avenue Papineau, EASTBOUND, Montréal, From July 12, 2026 at 8 p.m. to July 12, 2026 at 11:59 p.m., detour on local network. Reason : Special events.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
15
Saint-Bernard-de-Lacolle / Champlain
15
Restrictions at the Saint-Bernard-de-Lacolle border crossing in the northbound direction In Saint-Bernard-de-Lacolle The entry point of Saint-Bernard-de-Lacolle Northbound No lane closures Restrictions for non-standard vehicles in size having: more than 5 m high more than 2.6 m wide more than 23 m long Detour via the Lacolle port of entry via R-221, (on the other side of the US port of entry Overton Corners, NY). NOTE: This notice does not apply to road trains with trailers 16.2 m long or less.
15
Redevelopment of the primary inspection line at the border post In Saint-Bernard-de-Lacolle At the Saint-Bernard-de-Lacolle border crossing Northbound Reduction of the number of lanes from 8 to 3 towards Canada
15
Road maintenance In Brossard, on Marie-Victorin Boulevard, access from km 50.5 towards A-15 South SOUTHBOUND Access closed at all times Detour: Service road on Boulevard Marie Victorin, access via Boulevard Matte
15
Road maintenance In Brossard, on Marie-Victorin Boulevard, at the intersection with Rhoda Street SOUTHBOUND Boulevard closed at all times A-15 South detour, Exit 46, Marie Victorin Street, access to A-15 North, Exit 50 (Matte Boulevard)
Montréal
Closure R-136 between rue de la Montagne and avenue Papineau, EASTBOUND, Montréal, From July 12, 2026 at 8 p.m. to July 12, 2026 at 11:59 p.m., detour on local network. Reason : Special events.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
15
Road resurfacing In Montreal, at the Décarie interchange, access from Marcel-Laurin Boulevard to Highway 15 South SOUTHBOUND Access closed Detour A-15 SOUTH, exit 69, Jockey Street, Décarie Boulevard
15
Road resurfacing In Montreal, at the Décarie interchange, access from Highway 15 North to Highway 40 East NORTHBOUND Access closed Detour R-117 NORTH, turnaround to R-117 SOUTH, A-40 WEST and service road, Devonshire Place, A-40 EAST service road Optional route: Exit 69, Décarie Boulevard
15
Interview In Montreal, at the Laurentides interchange, towards Highway 40 East SOUTHBOUND Access closed Detour Service Road
15
Road resurfacing In Laval, access is from Sainte-Rose Boulevard NORTHBOUND Access closed Detour Light vehicles: R-117 SOUTH or A-15 SOUTH, exit 14-N, R-117 NORTH Heavy vehicles: A-15 SOUTH and exit 20, A-440
Laval
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
15
Installation of new sumps In Laval, access from A15-NORTH to Saint-Martin Boulevard NORTHBOUND Access closed Detour: Service road, Tessier street, Le Corbusier and Saint-Martin boulevards
15
Installation of new sumps In Laval, the Saint-Martin East access to Highway 15 South SOUTHBOUND Access closed Detour: Boulevard Corbusier, Tessier Street, A-15
15
Installation of new sumps In Laval, the Saint-Martin East access to A-15 North NORTHBOUND Access closed Detour via Le Corbusier and Tessier Boulevards
15
Road resurfacing Between Route 117 in Laval and Route 344 in Boisbriand, including the Gédéon-Ouimet Bridge NORTHBOUND Closure of 2 out of 3 lanes
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use