Back
Map
Road Conditions
Montérégie
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
132
Renovation of structures In Salaberry-de-Valleyfield Hébert Boulevard Between Léger and Masson streets In both directions Complete closure at all times Detour via the R-201, the A-530 and Boulevard Pie-XII.
132
Works: repair of the Louis-Hippolyte-La Fontaine Tunnel In Longueuil Closure of the R-132 WEST ramp to A-25 NORTH / tunnel (exit 89-N) From Friday 10:30 p.m. to Saturday 8 a.m. From Saturday 10:30 p.m. to Sunday 9 a.m.. Detour: via exit 82 towards Jacques-Cartier Bridge, Notre-Dame Street Trucks: via Pie-IX Boulevard
132
In Sorel-Tracy On Étienne Street under the R-132 (Turcotte Bridge) Southbound Complete closure Detour North Detour: via Désiré Street North, Montcalm Street West, Decelles Street South, Cormier Street East. North Detour: Etienne Street West, Désiré Street South, Marie-Victorin West, Decelles Street South. South Detour: Désiré Street South, Marie-Victorin Road West, Decelles Street South, Cormier Street East.
Mauricie—Centre-du-Québec
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
Work on the Laviolette Bridge will resume during weekday nights and sometimes on weekend nights until fall 2025.
Check the roadworks in detail for information, including the planned times of the obstructions.
132
Structural repair In Bécancour, on Bécancour Boulevard, at the bridge located over the Moulin River. Heading East. Alternating traffic at all times. -Detour for cyclists: via route 263, Chemin des Milans and Route des Pluviers. -No detour for cyclists going to Moulin Michel.
132
Reconstruction of a structure (P-04173) In Saint-Pierre-les-Becquets, at the bridge located over the Charland stream. In both directions From Monday, March 17 to Saturday, November 15, anytime. Complete closure of the lanes. Car Detour Detour route: via route 132, route 218, rue Principale / rang Sainte-Cécile, route 265 and route 132. Cyclists Detour route: via Route 132, Route Lelaidier, Rang Saint-Charles, Rang Saint-Joseph, 14th Avenue and Route 132.
132
Drilling In Deschaillons-sur-Saint-Laurent, on the Marie-Victorin road, at the bridge located over the Petite rivière du Chêne. In one direction at a time. Alternating traffic, Tuesday and Wednesday, between 7 a.m. and 4 p.m.
Chaudière-Appalaches
Work on pont Pierre-Laporte SOUTHBOUND, between Québec and Lévis, from September 2 to 16. Closure of 2 lanes out of 3, from Sunday to Wednesday between 9 pm and 5 am the next day and Thursday between 10 pm and 5 am the next day.
Closure R-276 Between Saint-Joseph-de-Beauce and Saint-Joseph-des-Érables, on the Chaudière River bridge, WESTBOUND and EASTBOUND, From August 30, 2025 at 6:30 p.m. to August 30, 2025 at 9:30 p.m., detour on local network. Reason : Special events.
L'Isle-aux-Grues - Montmagny: No ferry service from September 2 to 4. Cause: work. Visit the Société des traversiers du Québec website. Ferry service : Open.
132
Maintenance In Saint-Antoine-de-Tilly, WEST of route des Rivières Nord In both directions Alternating traffic, Tuesday between 8:30 am and 5 pm Track width reduced to 3 meters
132
Maintenance In Lévis (Saint-Nicolas), between rue des Érables and rue des Mélèzes In both directions Alternating traffic, Tuesday between 8:30 am and 5 pm
132
Road resurfacing In Lévis (Saint-Nicolas), between rue Moreau and rue Hormidas-Poirier In both directions Wednesday and Thursday between 7 pm and 5:30 am the next day - Alternating traffic Thursday between 1 am and 5:30 am - Closure R-116 at R-132 Detour: rue Cayer
132
Bridge repair In Lévis (Saint-Nicolas), between rue de la Tour and pont de Québec Tuesday between 7 pm and 5:30 am the next day In one direction at a time - Closed road, contraflow traffic on the opposite direction In both directions - Closure of 1 lane out of 2
132
Road resurfacing In Lévis (Saint-Nicolas), between A-73 and pont de Quebec Monday between 7 pm and 5:30 am the next day WESTBOUND - Road closed, contraflow traffic on the opposite direction EASTBOUND Depending on the working phase: - Closure of 1 lane out of 2 - Road Closed Detour: rue Jérôme-Demers, R-116, A-20 EST, A-73 NORD, pont Pierre-Laporte
132
Road resurfacing In Lévis, between R-175 (chemin du Sault) and rue de Mercure Between R-175 and rue Ernest-Lacasse: In both directions At all times - Closure of 1 lane out of 3 Between rue Ernest-Lacasse and rue de Mercure: At all times EASTBOUND - Road closed, contraflow traffic on the opposite roadway In both directions - Closure of 1 lane out of 2 Lane width reduced to 4 meters
132
Road redevelopment In Lévis, between boulevard Alphonse-Desjardins and rue Saint-Omer WESTBOUND - Road closed, contraflow traffic on the opposite roadway In both directions - Closure of 1 lane out of 2 Lane width reduced to 3.5 meters
Bas-Saint-Laurent—Gaspésie—Îles-de-la-Madeleine
Oversized cargo ships are operating between the port of Gros-Cacouna and Saint-Antonin as part of a new wind power project. These transports of immense pieces will continue until the end of November 2025.
The routes used by these transports are highways 20 and 85, routes 191 and 291 as well as local roads such as route de la Station, route des Roches and chemin de Rivière-Verte in Saint-Antonin, among others.
Be careful and patient!
132
Culvert repair In Matane, between rue du Port and R-195 In both directions Closure of 1 lane out of 2 at all times
132
Pavement repair Between route Auclair in Rivière-à-Claude and route Pierre-Godefroi-Coulombe in Mont-Saint-Pierre In both directions Alternating traffic, from Monday to Friday between 6 am and 7 pm
132
Retaining wall repair In Saint-Maxime-du-Mont-Louis, between R-198 and rue de la Chute In both directions Alternating traffic at all times
132
Road repair In Gaspé, between rue Laflamme and chemin du Portage In both directions Alternating traffic, continuously from Monday at 7 am to Friday at 6 pm Track width reduced to 3.5 meters
132
Reconstruction of the bridge In Gaspé, between Avenue Kennedy and Chemin de Seal Cove In both directions Alternating traffic on a diverted road at all times Lane width reduced to 5 meters Clearance of 4.57 meters under the telecommunications wires of the deviation path
132
Replacing a culvert In Percé, between Route de la Station and Route de la Pointe-Saint-Pierre In both directions Alternating traffic on a deviated road at all times Lane width reduced to 5 meters
132
Drilling In Percé, WEST of rue de Belle-Anse In both directions Alternating traffic, Sunday to Friday between 7 am and 5 pm
132
Culverts replacement In Percé, between Route Lemieux and Route de la Pointe-Saint-Pierre In both directions Alternating traffic, from Monday to Friday between 6:30 am and 6 pm Speed limit: 60 km/h
132
Bridge reconstruction In Percé, at rue de la Plage In both directions Alternating traffic at all times
132
Construction of a retaining wall In Percé, between Rue des Peupliers and Rue des Trembles In both directions Alternating traffic at all times Lane width reduced to 3.6 metres
132
Public services In Chandler, between avenue de la Chaloupe and rue McKinnon EASTBOUND Traffic on a narrowed lane to 3 meters at all times
132
In Chandler, on the rivière du Petit Pabos bridge In both directions Alternating traffic at all times Lane width reduced to 3.5 meters
132
Bridge construction In Chandler, between rue des Castilloux and rue des Beaux-Sables In both directions Alternating traffic on a detour road at all times Lane width reduced to 4.5 metres Tight turning radius
132
Bridge reconstruction In Chandler, on the rivière du Grand Pabos bridge In both directions From Thursday, August 21 to Wednesday, August 27; From Tuesday, September 2 to Wednesday, September 10: - Alternating traffic, Monday to Sunday between 7 am and 5 pm
132
Public services Between route Chapados in Port-Daniel-Gascons and route Allain in Chandler In both directions Alternating traffic, from Monday to Thursday between 6 am and 6:30 pm
132
Slope stabilization In Saint-Siméon, WEST of chemin Arbour In both directions Alternating traffic at all times Lane width reduced to 5 metres
132
Road resurfacing In Caplan, between the two ends of chemin des Lilas In both directions Alternating traffic, from Monday to Friday between 6 am and 6 pm
132
Beach replenishment In Maria, between Rue des Engoulevents and Rue des Colibris In both directions Occasional disruptions depending on the progress of the works, from Monday at 7 am to Friday at 6:30 pm: - Alternating traffic - Traffic on diverted and narrowed lanes Lanes width reduced to 3.3 meters
132
Road resurfacing In Gesgapegiag, at rue Main EASTBOUND Traffic on a narrowed lane, Monday to Friday between 6 am and 6:30 pm Track width reduced to 3 meters
132
Structural inspection In the Routhierville area, at km 1470 In both directions Alternating traffic, Wednesday between 6:30 am and 8 pm Lane width reduced to 5 metres
132
Pavement repair In Causapscal, between rue Cartier and rue Barriault In both directions Alternating traffic, from Monday to Friday between 6 am and 6 pm
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use