Québec 511
  • Back
  • Map

Road Conditions

    Montréal

    • Louis-Hippolyte-La Fontaine tunnel

      Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
    • 13 Reconstruction of the overpass In Montreal, near Highway 520 NORTHBOUND Highway closed
    • 13 Reconstruction of the overpass In Montreal, access is from Courval Street. NORTHBOUND Access closed Detour via Montée de Liesse or 32nd Avenue
    • 13 Reconstruction of the overpass In Montreal, exit 3-O (A-520 OUEST) NORTHBOUND Exit closed Detour Exit 3-E, Chemin de la Côte-de-Liesse and Montée de Liesse
    • 13 Reconstruction of the overpass In Montreal, near Highway 520 In both directions Traffic will be diverted and narrowed at all times. May 14, starting at 5 a.m., addition of the northbound lane diversion Lane width reduced to 3.25 meters each

    Laval

    • Louis-Hippolyte-La Fontaine tunnel

      Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
    • 13 Slab repair In Laval, between Saint-Martin and Dagenais boulevards Heading North Closure of 2 out of 3 lanes
    • Current Warnings
    • Road Conditions
    • Traffic Cameras
    • Who can consult this page?
    • Français
    • Terms of use