Back
Map
Road Conditions
Montréal
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
13
Reconstruction of the overpass In Montreal, near Highway 520 In both directions Traffic will be diverted and narrowed at all times. Lane width reduced to 3.25 meters each
13
Inspection Between Montreal and Laval, on the Louis-Bisson Bridge NORTHBOUND Closure of 2 out of 4 lanes
Laval
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
13
Slab repair In Laval, between Sainte-Rose Boulevard and A-440 In both directions SOUTHBOUND The highway is closed at all times, traffic is diverted onto the service road from Dagenais Boulevard. From Monday to Friday between 4 a.m. and 11 a.m.: 1 additional countraflow lane on the NORTHBOUND carriageway Note: the right shoulder of the service road is reserved for BUSES during this period
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use