Back
Map
Road Conditions
Abitibi-Témiscamingue
117
Resurfacing work In Réservoir-Dozois, in the La Vérendrye wildlife reserve, between km 386 and 394 In both directions Alternating traffic, every day, between 7 a.m. and 7 p.m. Track width: 5 meters,
117
Paving In Val-d'Or On 3rd Avenue Between the paths of Recovery and Peter-Ferderber Counterflow traffic Monday to Friday, 6 a.m. to 8 p.m.
117
Asphalting In Val-d'Or, on Tétrault Boulevard, between the north exit of the Jean-Jacques-Cossette roundabout and the south exit of the Sullivan roundabout In both directions Complete closure Monday and Tuesday from 9 p.m. to 5:45 a.m. the next day Detour Main route: 7th St., 6th St., 4th Ave., 1st St., Sullivan Rd. then arrived at R117-N. Routing for Hydro: Léo-Fournier to the JJ-Cossette interchange then follow the main route.
Laurentides—Lanaudière
Sorel-Tracy - Saint-Ignace-de-Loyola: Departures from Saint-Ignace-de-Loyola each hour and departures from Sorel-Tracy at the half of each hour, for an undetermined period. Reason: 1 ferry in operation. Ferry service : Open.
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
117
Works: lighting In Mirabel, Curé-Labelle Boulevard, between Côte Saint-Pierre and Brault Street In both directions Closure of 1 out of 2 lanes at all times
117
Works: vegetation maintenance In Sainte-Adèle, Boulevard Labelle Between Rue du Gai Luron and Chemin du Val-Royal Alternating traffic, Friday, Monday and Tuesday between 7 a.m. and 3 p.m.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use