Québec 511
  • Back
  • Map

Road Conditions

    Montréal

    • Louis-Hippolyte-La Fontaine tunnel

      Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
    • 10 Lane reconfiguration In Montreal, on the Bonaventure Expressway, between Wellington Street and the Victoria Bridge In both directions 1 of 3 lanes will be closed, and traffic will be diverted at all times.
    • 10 Repair of beams on the Clément bridge In Montreal, on the Clement Bridge WESTBOUND One out of two lanes closed at all times

    Estrie

    • 10 Interview In Eastman, between km 101.5 and 112.5 EASTBOUND Closure of 1 out of 2 lanes, Monday to Thursday between 10am and 3pm
    • Current Warnings
    • Road Conditions
    • Traffic Cameras
    • Who can consult this page?
    • Français
    • Terms of use