Back
Map
Road Conditions
Montréal
Louis-Hippolyte-La Fontaine tunnel
Height clearance reduced to 4.3 meters since May 5, 2025. Recreational vehicles, among others, make sure to respect the height clearance before including the tunnel in your itinerary. .
10
Lane reconfiguration In Montreal, on the Bonaventure Expressway, between Wellington Street and the Victoria Bridge In both directions 1 of 3 lanes will be closed, and traffic will be diverted at all times.
10
Repair of beams on the Clément bridge In Montreal, on the Clement Bridge WESTBOUND One out of two lanes closed at all times
Estrie
10
Interview In Eastman, between km 101.5 and 112.5 EASTBOUND Closure of 1 out of 2 lanes, Monday to Thursday between 10am and 3pm
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use