Back
Map
Road Conditions
Current Warnings
Thaw period
Estrie
10
Interview In Eastman, between km 101.5 and 112.5 EASTBOUND Closure of 1 out of 2 lanes, Monday to Thursday between 10am and 3pm
55
Asphaltage À Saint-François-Xavier-de-Brompton, accès de la R-249 vers l’A-55 SUD Dans les deux directions Accès fermé - En continu du dimanche à 21 h au vendredi à 16 h Détour R-249 Nord, R-143 Sud, rue Laval, accès vers A-55 SUD
55
Asphalt Between km 72 (before exit 71, R-249) in Saint-François-Xavier-de-Brompton and km 61 (before exit 60, Laval Street) in Sherbrooke In both directions Road closed SOUTHBOUND, contraflow traffic diverted to the opposite direction - Continuously from Sunday at 9 p.m. to Friday at 4 p.m.
55
Structural inspection In Melbourne, near the railway NORTHBOUND Closure of 1 out of 2 lanes
410
Asphalt In Sherbrooke, exit 6 (Boulevard de l'Université) EASTBOUND Exit closed - From Sunday to Wednesday between 7:30 pm and 6:00 am the next day - Thursday between 9 p.m. and 6 a.m. the next day Detour via King Street West, Jacques-Cartier Boulevard South, Marie-Léonie Street, Galt Street West, University Boulevard
410
Structural inspection In Sherbrooke, at the intersection of Galt Street West In both directions Closure of 1 out of 2 lanes
410
Asphalt In Sherbrooke, between the access from King Street West and the access from University Boulevard EASTBOUND Highway closed - From Sunday to Wednesday between 7:30 pm and 6:00 am the following day - Thursday between 9 p.m. and 6 a.m. the following day Detour via King Street West, Jacques-Cartier Boulevard South, Marie-Léonie Street, Galt Street West, University Boulevard
116
Structural inspection In Danville, on the bridge over the Nicolet River Southwest In both directions Alternating traffic
133
St-Armand/Philipsburg / Highgate Springs
139
Asphalt In Sutton, on Principale Street South and North, between River Street and Academy Street In both directions Alternating traffic, Monday to Friday between 6 a.m. and 10 p.m.
139
Structural inspection In Granby, on the bridge over the North Yamaska River In both directions Alternating traffic
143
Asphalt Between Route 141 in Stanstead-East and Route 208 in Hatley In both directions Alternating traffic - Monday to Friday between 7 a.m. and 6 p.m.
147
Stanhope / Norton
204
1 lane closed out of 2 R-204 at height chemin du Lac-Drolet, WESTBOUND and EASTBOUND, Audet, undetermined period. Reason : Road failure.
212
Culvert repair At Newport, WEST of Lawrence Road In both directions Alternating traffic at all times
212
Construction of a culvert At Saint-Augustin-de-Woburn, Notre-Dame ascent, on the Clinton River culvert In both directions Alternating traffic on reduced lanes, at all times Lanes width reduced to 5 meters
212
Construction of a culvert In Saint-Augustin-de-Woburn, on the 3rd and 4th Range Road, between Route 212 and the Lac-Ouest Road In both directions Road closed at all times
214
Mintenance Between McLeod Creek in Hampden, and Dell Road in Milan In both directions Alternating traffic - From Monday to Thursday between 7 a.m. and 6 p.m.
215
Asphalt In Sutton, on Pleasant Street at the intersection with Main Street North In both directions Alternating traffic, Monday to Friday between 6 a.m. and 10 p.m.
235
Road resurfacing In Bedford, Dutch Street, between Taylor Street and Rix Street In both directions Complete closure at all times Detour via Sheltus Road, Maurice Road (South Victoria Street), River Street (R-202)
237
Bridge reconstruction In Frelighsburg, on Principale Street, on both sides of Richford Road In both directions Alternating traffic at all times
241
Maintenance Between Beaumont Street in Shefford and Fortin Street in Waterloo In both directions Alternating traffic, Monday to Thursday between 7 a.m. and 6 p.m.
243
Road resurfacing In Richmond, on North Melbourne Avenue, at the R-116 intersection In both directions Alternating traffic at all times Height restrictions Clearance height : 4.46 meters
263
Structural inspection In Martson, on the Victoria River bridge Alternating traffic
Bridge reconstruction In Frelighsburg, on Richford Road, on the bridge over the Pike River In both directions Alternating traffic at all times
Public services In Granby, on Robinson Street South, on the Robinson Bridge NORTHBOUND June 8 Closure of 1 out of 2 lanes - Monday between 7 a.m. and 4 p.m. In both directions From June 9th to 19th Alternating traffic - Monday to Friday between 7 a.m. and 4 p.m. NORTHBOUND From June 20th to July 17th Closure of 1 out of 2 lanes - Monday to Friday between 7 a.m. and 4 p.m. Lane width reduced to 3.65 meters
Asphalt In Saint-François-Xavier-de-Brompton, on the 2nd Range Road, at the end of exit R-249 In both directions Closure of 1 out of 2 lanes - Continuously from Sunday at 9 p.m. to Friday at 4 p.m.
Asphalt In Sutton, on Maple Street, at the intersection with Main Street North In both directions Alternating traffic, Monday to Friday between 6 a.m. and 10 p.m.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use