Back
Map
Road Conditions
Current Warnings
Thaw period
Outaouais
5
Manhole replacement In Gatineau, A-5, between Saint-Raymond Boulevard and the Hautes-Plaines Boulevard access Heading North Highway closed Thursday between 8 p.m. and 5 a.m. the following day Detour R-105 NORTH, Scott Road
5
Manhole replacement In Gatineau, A-5 between exit 3 (Saint-Raymond Boulevard) and Hautes-Plaines Boulevard Heading North Highway closed, Thursday between 8 p.m. and 5 a.m. the following day Detour R-105 NORTH, Scott Road
5
Manhole replacement In Gatineau, A-5, between Boulevard des Hautes-Plaines and Route 105 (Boulevard Saint-Joseph) In both directions Closure of 1 out of 2 lanes, at all times. Lane reduced to 3.5 meters.
5
Manhole replacement In Gatineau, A-5, between exit 8 (Boulevard des Hautes-Plaines) and Boulevard du Mont-Bleu Heading South Highway closed Friday between 8 p.m. and 5 a.m. the following day Detour via the boulevards of Hautes-Plaines, Jeunes and Mont-Bleu
50
Bridge reconstruction In Gatineau, between De Masson Road and Des Laurentides Street Road closed WESTBOUND, contraflow traffic on the EASTBOUND lane, at all times WESTBOUND, exit 159 (Ange-Gardien) closed Detour Exit 154 (Airport Boulevard), A-50 EAST Lane width reduced to 4 meters
50
Maintenance work In Thurso, on the A-50, between the exit to Route 317 and the access to Chemin de Masson (R-315) Heading East Highway closed from Tuesday at 11 p.m. until 5 a.m. the following day Detour R-317 South, R-148 West and R-315
50
Maintenance work In Plaisance, A-50, exit towards Papineau Hill Heading west Exit closed Detour A-50 WEST, Route 317 exit, A-50 EAST
50
Maintenance work In Plaisance, on the A-50, at the Papineau hill In both directions Highway closed from Sunday 11 p.m. to 5 a.m. the following day Detour via R-148 EAST, R-321 NORTH or A-50 WEST, exit 187, R-317
50
Maintenance work In Plaisance, A-50 access from Montée Papineau Heading East Entrance closed Northbound detour: A-50 West, exit route-317 and return to A-50 East. SOUTH: continue to Route 148 East and Route 321 North
105
Planing and resurfacing In Low, on Route 105, between Main Road and Lacharity Road, In both directions Alternating traffic, Monday to Friday, between 7 a.m. and 5 p.m. Lane reduced to 3.5 meters.
105
Structural inspection At Kazabazua, R-105, above the Kazabazua River, In both directions Alternating traffic,
105
Inspection In Maniwaki, between Fafard Street and Industrial Park Road In both directions Sporadic, short-term disruptions, alternating traffic or closure of one out of two lanes, from Wednesday to Friday, between 8 a.m. and 8 p.m.
105
Extension of the water supply network At Kitigan Zibi, Route 105, between Jojo Okitigan Street and approximately one kilometer south of Makwa Road In both directions Alternating traffic at all times
105
Structural inspection At Maniwaki, R-105, above the Desert River In both directions Alternating traffic
105
Culvert reconstruction In Bois-Franc on Route 105, approximately 600 meters east of Chemin Pilon In both directions Alternating traffic at all times Lane narrowed to 3.2 meters.
107
Structural inspection At Déléage, on Route 107, above Hall Creek In both directions Alternating traffic
148
Asphalt In Pontiac, on Route 148, between Kennedy and Gibson Roads In both directions Alternating traffic, Monday to Saturday, between 7 a.m. and 5:30 p.m.
301
Culvert replacement At Otter Lake, R-301, between Lafleur Street and 600 meters south of R-366 In both directions Alternating traffic, Monday to Friday, at all times
303
Culvert reconstruction In Clarendon, on Route 303, approximately 1 kilometer east of the 5th Concession In both directions Alternating traffic between 7 a.m. and 4 p.m.
303
Culvert reconstruction In Clarendon, on Route 303, approximately 200 meters east of the 5th Concession In both directions Alternating traffic between 7 a.m. and 4 p.m.
315
Security At Lac-Simon, on Route 315, between Caron and Sabourin roads In both directions Closure of 1 out of 2 lanes at all times
323
Temporary bridge construction In Saint-Émile-de-Suffolk, between Rang des Pruniers and Chemin des Pins Alternating traffic, every day between 6:30 a.m. and 5:30 p.m. Lane width reduced to 4.5 meters
Asphalt In Pontiac, on Earldley-Masham Road, between Route 147 and Gatineau Park In both directions Alternating traffic, Monday to Friday, between 7:30 a.m. and 7 p.m.
Structural inspection In Bouchette, on Rue du Pont, above the Gatineau River In both directions bridge closed with detour Detour via the roads of Rivière-Gatineau Sud, Bouchette and Point-Comfort, to Clément, R-105 NORTH, Principale Street and Ferme-des-Six Road.
Structural inspection In Chichester, on the Pembrooke road, above the Culbute channel (des Outaouais river) In both directions Alternating traffic
Bridge reconstruction In Gatineau, on Georges Street, near Highway 50 Heading North Closure of 1 out of 2 lanes, at all times narrowed to 3.5 meters.
Structural inspection In Gracefield, on Cayamant Road, above the Blue Sea River In both directions Alternating traffic
Structural inspection In Gracefield, on Point Comfort Road, above the Gatineau River In both directions Alternating traffic
Structural inspection In Gracefield, on Blue Sea Road, above the Blue Sea River In both directions Alternating traffic
Structural inspection In Gracefield, on Labelle Road, above the Blue Sea River In both directions Alternating traffic
Structural maintenance In Kazabazua, on the road to Lake Sainte-Marie, about 400 meters south of the Kuujiuaq road In both directions Alternating traffic, Monday to Thursday, between 7:30 a.m. and 5 p.m. Lane narrowed to 3 meters.
Structural inspection At Kazabazua, on the road to Lake Sainte-Marie, above the Gatineau River In both directions Alternating traffic
Structural inspection At Kazabazua, on the Cherry Stream road, above the Picanoc River In both directions Alternating traffic
Bridge repairs In Mayo, on the Rivière-Blanche road, at the level of the White River In both directions Closure of 1 out of 2 lanes, at all times
Maintenance work In Plaisance on montée Papineau, between the A-50 access points Heading North Alternating traffic
Bridge replacement In Plaisance, on the Chemin des Presqu'Îles, between Rue Martin and the Chemin de la Grandes Presqu'Île, above the Petite Nation river In both directions Alternating traffic at all times
Structural reconstruction At Lac-des-PLages, on the Chemin du Lac-de-la-Carpe, near the Chemin du Lac-de-la-Carpe bridge In both directions Alternating traffic at all times, on a detour route. Trucks are prohibited from circulating (width reduced to 3.5 meters).
Alternating traffic chemin du Barrage on the bridge over the Blanche River. Lane width reduced to 4.6 meters., WESTBOUND and EASTBOUND, Val-des-Monts, undetermined period. Reason : Preventive measures.
Alternating traffic Chemin Eardley-Masham at height chemin Bradley, SOUTHBOUND and NORTHBOUND, Pontiac, undetermined period. Reason : Broken-down truck.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use