Back
Map
Road Conditions
Outaouais
50
Structural repair work In Gatineau, on the Guy-Lafleur highway, above the A-5 and Montclair Boulevard In both directions Closure of 1 out of 2 lanes at all times with complete closure, from Monday 9 p.m. to Tuesday 5 a.m. (September 15 to 16) Detour When completely closed, Westbound: via Boulevard Maisonneuve and then Boulevard des Allumettières. Eastbound: via Montcalm Boulevard then Maisonneuve Boulevard to Highway 5 and take the Highway 50 East ramp.
50
Structural repair work In Gatineau, on the Guy-Lafleur highway, from exit 159 (rue des Laurentides) and 2 km before avenue Lépine (exit 171) In both directions Contraflow traffic with one lane per direction at all times,
105
Drilling and coring work In Bouchette, on Route 105, between Chemin Patry and Chemin Gagnon Alternating traffic, Monday to Friday, between 8 a.m. and 5 p.m.
105
Travaux de resurfaçage À Maniwaki, sur la rue Principale, entre les rues des Oblats et Gareau Dans les deux directions Fermeture complète, de dimanche à jeudi, entre 18 h 30 et 6 h le lendemain
105
Resurfacing work In Maniwaki, on Main Street, between Commerciale and Oblats Streets In both directions Complete closure, Sunday to Thursday, between 6:30 p.m. and 6 a.m. the following day Detour via Notre-Dame, Laurier and Oblats streets
105
Resurfacing work In Bois-Franc, on Route 105, between Chemin du Parc-Industriel and 2 km north of Chemin Pilon In both directions Alternating traffic, Monday to Friday, between 7 a.m. and 5 p.m.
148
Resurfacing of the shoulders. In Mansfiel-et-Pontefract, on Waltham Boulevard, between Thomas-Lefebvre Street and Black River Road In both directions Alternating traffic, Monday to Thursday, between 7 a.m. and 3 p.m.
148
Renovation of road infrastructure In Pontiac, on Route 148, between Westbrooke and Kennedy Roads In both directions Alternating traffic, from Monday to Thursday, between 7 a.m. and 5 p.m., and Friday between 7 a.m. and 12 p.m.
148
Infrastructure and culvert repair work In Pontiac on route 148 between the Lebrun and Dominican Fathers roads In both directions Contraflow traffic on the west span at all times Lane narrowed to 4.5 meters in each direction
301
Asphalt work In Otter Lake, on Route 301, at Lafleur Road, In both directions Alternating traffic, Monday to Thursday, between 7 a.m. and 4:30 p.m.
307
Renovation work In Cantley and Val-des-Monts, on the Montée de la Source, 800 meters on either side of Chemin Townline In both directions Alternating traffic, Wednesdays and Thursdays, between 7 a.m. and 7 p.m.
307
Culvert reconstruction In Val-des-Monts, on the Main Road, between Chemin des Érables and Chemin de la Colline In both directions Alternating traffic, from Monday to Thursday, at all times Lane narrowed to 3.2 meters.
315
Culvert repair In Chénéville, between the Dinel and Racicot climbs In both directions Alternating traffic, as needed, Monday to Friday, between 7 a.m. and 5 p.m.
321
In Saint-André-Avellin, on the bridge of rivière Petite Nation river bridge, track width reduced to 2.5 meters SOUTHBOUND. Undetermined period. Cause: preventive measures.
366
Culvert reconstruction In La Pêche, on Chemin Pontbriand, approximately 1.5 km east of Chemin Guilbeault In both directions Alternating traffic, Monday to Thursday, between 7 a.m. and 4 p.m.
Drilling and coring work In Bouchette, on Main Street, between wheel 105 and Côte Street In both directions Alternating traffic, Monday to Friday, between 8 a.m. and 5 p.m.
Inspection work In Gracefield, on Point-Comfort Road, between Grondin and Bouchette Roads, In both directions Alternating traffic, Monday to Friday, between 6 a.m. and 8 p.m.
Ditch cleaning On Grand-Calumet Island, on the Outaouais Road, between the Monseigneur-Martel hill and the Ligne-des-Bouleaux road. In both directions Alternating traffic, Monday to Thursday, between 7 a.m. and 4 p.m.
preventive closure In Saint-Émile-de-Suffolk, on Rang des Pruniers, between Route 323 and Chemin du Lac-Tremblant In both directions Alternating traffic at all times Track narrowed to 3 meters and tonnage reduced to 10 tonnes.
Bridge safety work In Saint-Sixte, on the Saint-André hill, above the Saint-Sixte river In both directions complete closure of the bridge, at all times. Detour via the climbs of St-André Avellin, Ivall and Gore.
Bridge replacement In Val-des-Bois, on Chemin de la Montagne, between Chemin Lépine and 200 meters east of Ruisseau de l'Argile In both directions complete closure with traffic on a diversion route, at all times
Alternating traffic chemin du Barrage on the bridge over the Blanche River. Lane width reduced to 4.6 meters., WESTBOUND and EASTBOUND, Val-des-Monts, undetermined period. Reason : Preventive measures.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use