Back
Map
Road Conditions
Current Warnings
Thaw period
Outaouais
5
Manhole replacement In Gatineau and Chelsea, on Highway 5, between the exit for Saint-Joseph Boulevard (Route 105) and Hautes-Plaines Boulevard Heading North Highway closed Sunday between 8 p.m. and 5 a.m. the following day Detour via Saint-Joseph Boulevard (R-105) and Scott Road in Chelsea.
5
Manhole replacement In Gatineau, A-5, between Boulevard des Hautes-Plaines and Route 105 (Boulevard Saint-Joseph) In both directions Closure of 1 out of 2 lanes, at all times. Lane reduced to 3.5 meters.
5
Manhole replacement In Gatineau, Highway 5, between exit 8 (Boulevard des Hautes-Plaines) and the access from Boulevard Saint-Joseph (R-105). Heading South Highway closed Monday between 8 p.m. and 5 a.m. the following day Detour via the boulevards of Cité-des-Jeunes, Mont-Bleu and Saint-Raymond
5
Manhole replacement A-5, between exit 8 (Boulevard des Hautes-Plaines) in Gatineau and the access from Scott Road, in Chelsea Heading North Highway closed on Wednesday between 8 p.m. and 5 a.m. the following day Detour via Boulevard des Hautes-Plaines) towards the West, Boulevard de la Cité-des-Jeunes Nord, then Notch, Kingsmere and Scott roads towards the north.
50
Maintenance work In Gatineau, A-50 exit 134 (boul. des Allumettières, R-148) In both directions Exit closed Detour via Highway 50 West, Montcalm Street, Saint-Joseph Boulevard, then back onto Route 148 West
50
Maintenance work In Gatineau, on Highway 50 between Boulevard des Allumettières and Highway 5 Heading west Closure of 2 out of 3 lanes,
50
Maintenance work In Gatineau, on the Guy-Lafleur highway, between the A-5 and the R-148 Heading East Closure of 1 out of 2 lanes
50
Bridge reconstruction In Gatineau, between De Masson Road and Des Laurentides Street Road closed WESTBOUND, contraflow traffic on the EASTBOUND lane, at all times WESTBOUND, exit 159 (Ange-Gardien) closed Detour Exit 154 (Airport Boulevard), A-50 EAST Lane width reduced to 4 meters
105
Planing and resurfacing In Low, on Route 105, between Main Road and Lacharity Road, In both directions Alternating traffic, Monday to Friday, between 7 a.m. and 5 p.m. Lane reduced to 3.5 meters.
105
Inspection In Maniwaki, between Fafard Street and Industrial Park Road In both directions Sporadic, short-term disruptions, alternating traffic or closure of one out of two lanes, from Wednesday to Friday, between 8 a.m. and 8 p.m.
148
Infrastructure and culvert repairs In Pontiac, on Route 148, 350 meters east of Kennedy Road at Wiggins Road In both directions Alternating traffic, every day, between 7 a.m. and 5 p.m.
148
Infrastructure and culvert repairs In Pontiac, on Route 148, between 2 km west of Gibson Road and Town Hall Road In both directions Alternating traffic between 7 a.m. and 5 p.m.
148
Infrastructure and culvert repairs In Pontiac, on Route 148, about one kilometer west of Tremblay Road In both directions One of the two lanes will be closed between 7 a.m. and 5 p.m.
148
Maintenance work Promenade du Lac-des-Fées, between rue Saint-Jean-de-Bosco and the on-ramp to boulevard des Allumettières EST Heading North complete closure Detour - Detour #1 via Saint-Jean Bosco, then Demontigny Street, then Allumettières West and back to Lac-des-Fées North -Detour # 2: Via Lac-des-Fées southbound, Graham, then Boul. Saint-Joseph northbound, then Allumettières West and back to Lac-des-Fées northbound.
301
Culvert replacement On Route 301, between Route 366 in Thorne, and Quaile Street (R-303) in Otter Lake In both directions road closed at all times Northbound : via Route 366, left onto Route 303, right onto Route 301 North Southbound:via Route 303/Quaile Street, Route 366, Route 301 South.
307
Culvert reconstruction In Val-des-Monts, on Route 307, between Lange Road and Pont Road In both directions Alternating traffic, at all times Lane narrowed to 3.2 meters.
323
Temporary bridge construction In Saint-Émile-de-Suffolk, between Rang des Pruniers and Chemin des Pins Alternating traffic, every day between 6:30 a.m. and 5:30 p.m. Lane width reduced to 4.5 meters
Culvert reconstruction In Denholm on du Poisson blanc Road, between des Voyageurs and des Plaines roads In both directions Alternating traffic Lane reduced to 3.2 meters.
Bridge reconstruction In Gatineau, on Georges Street, at Highway 50 Contraflow traffic, contraflow traffic at all times Lane width reduced to 3.5 meters
Inspection In Gatineau, on Fournier Boulevard, between Jacques-Cartier Street and the Lac-Deamy promenade In both directions Closure of one of the two lanes,
Maintenance work In Montpellier, Baie-de-l'Ours road, on the bridge (located between Périard road and Réserve Faunique-Papineau-Labelle road) In both directions Completely closed at all times Detour via the Crique à la Roche road and Route 315.
Bridge replacement In Plaisance, on the Chemin des Presqu'Îles, between Rue Martin and the Chemin de la Grandes Presqu'Île, above the Petite Nation river In both directions Alternating traffic at all times
Structural reconstruction At Lac-des-PLages, on the Chemin du Lac-de-la-Carpe, near the Chemin du Lac-de-la-Carpe bridge In both directions Alternating traffic at all times, on a detour route. Trucks are prohibited from circulating (width reduced to 3.5 meters).
Alternating traffic chemin du Barrage on the bridge over the Blanche River. Lane width reduced to 4.6 meters., WESTBOUND and EASTBOUND, Val-des-Monts, undetermined period. Reason : Preventive measures.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use