Back
Map
Road Conditions
Current Warnings
Pohénégamook – Picard – Saint-Antonin wind farm project and the Wolastokuk territory in the Lower St. Lawrence.
From May 25th until December 2026:
Transports of enormous parts will circulate day and night, between the storage area in Saint-Antonin and the wind farm site on the Rivière-Verte road, the Station and Roches roads and the Champoux road.
Transportation will also be available during the day between Matane and Saint-Antonin on the R-132, the A-20, the R-191, the R-291, the A-85, 6th Range, Route des Roches and Chemin Champoux.
Be careful!
Mesgi'g Ugju's'n 2 wind project in Gaspésie, north of L'Alverne and Escuminac
Starting May 27, oversized transport vehicles will be operating in the Gaspé Peninsula until the fall of 2026.
These transports of enormous parts will circulate day and night, on the Inter-Provincial Boulevard between the JC Van Horne bridge and the R-132 in Pointe-à-la-Croix, then on the R-132 towards the access to the Sainte-Florence wind farm site.
Be careful!
Bas-Saint-Laurent—Gaspésie—Îles-de-la-Madeleine
20
Bridge repair Between km 448 in Rivière-Ouelle and km 451 in Saint-Pacôme Road closed WESTBOUND, contraflow traffic on the opposite roadway (1 lane per direction) at all times WESTBOUND: lane width reduced to 3.65 meters EASTBOUND: lane width reduced to 5 meters
85
Asphalting In Dégelis, between km 20 and 8 Road closed SOUTHBOUND, contraflow traffic on the opposite roadway at all times Lane width reduced to 4.5 meters
85
Highway construction In Saint-Louis-du-Ha! Ha!, NORTH of rue Raymond, between km 48 and 50 Contraflow traffic on the SOUTHBOUND roadway (1 lane per direction) at all times Lane width reduced to 5 meters
85
Closure A-85 at height km 99, SOUTHBOUND, undetermined period, detour A20 Est Sortie 514, Route 191 pour A85. Reason : Accident.
132
Maintenance In Kamouraska, EAST of Route du Cap-Taché In both directions Alternating traffic, Wednesday and Thursday between 7 a.m. and 5 p.m.
Rivière-du-Loup - Saint-Siméon: For updates on the status of the ferry service, please consult the ferry Website. Ferry service : Open.
Rivière-du-Loup - Saint-Siméon
132
Road construction In Sainte-Luce, WEST of chemin de la Mer In both directions Alternating traffic, from Wednesday to Friday between 7 am and 8 pm
132
Road redevelopment In Sainte-Flavie, WEST of Chemin Perreault WESTBOUND Traffic on a narrowed lane at all times Lane width reduced to 3.5 meters
132
Road redevelopment Between chemin Perreault in Sainte-Flavie and R-234 in Grand-Métis In both directions Alternating traffic
132
Maintenance In Sainte-Flavie, EAST of rue Pelletier In both directions Alternating traffic, from Monday to Friday between 7 a.m. and 4 p.m.
132
Asphalting In Saint-Ulric, on both sides of avenue Ulric-Tessier In both directions Alternating traffic, continuously from Monday at 6:30 a.m. to Friday at 6:30 p.m. Lane width reduced to 3.5 meters
Matane - Baie-Comeau
Matane - Godbout
132
Traffic management elements In Matane, on both sides of boulevard Dion From Monday to Thursday between 7 a.m. and 6 p.m., depending on the progress of the work: In one direction at a time Road closed, contraflow traffic on the opposite roadway In both directions Closure of 1 lane out of 2 Lane width reduced to 3.5 meters each
132
Traffic management elements In Matane, on both sides of Avenue Saint-Jérôme In both directions From Monday to Thursday between 7 a.m. and 6 p.m., depending on the progress of the work: In one direction at a time Road closed, contraflow traffic on the opposite roadway In both directions Closure of 1 lane out of 2 Lane width reduced to 3.5 meters each
132
Retaining wall repair In Saint-Maxime-du-Mont-Louis, WEST of rue du Ruisseau-à-Flétan In both directions Alternating traffic at all times Lane width reduced to 4 metres
132
Asphalt In Sainte-Madeleine-de-la-Rivière-Madeleine, EAST of Rue Levesque In both directions Alternating traffic, Monday to Friday between 6 a.m. and 6 p.m. Lane width reduced to 3.5 meters
132
Culvert replacement In Sainte-Madeleine-de-la-Rivière-Madeleine, on both sides of Rue Bellevue In both directions Alternating traffic on a detour route at all times Lane width reduced to 3.5 meters
132
Culvert Reconstruction In Percé (Saint-Georges-de-Malbaie sector), WEST of route de la Station In both directions Alternating traffic at all times Lane width reduced to 3.5 meters
132
Public services Between route de la Passerelle in Port-Daniel-Gascons and route Allain in Chandler In both directions Alternating traffic, from Monday to Thursday between 6 am and 6:30 pm Lane width reduced to 3.5 meters
132
Asphalting Between route Christie in New Carlisle and rue Day à Paspébiac In both directions Alternating traffic, from Sunday to Thursday between 6:30 p.m. and 6 a.m. the next day
185
Highway construction In Saint-Louis-du-Ha! Ha!, between km 50 and 55 In both directions Traffic on diverted road at all times. Lane width reduced to 4.5 meters
198
Public services In Gaspé, between Boulevard de York Ouest and R-132 WESTBOUND If needed: Closure of 1 lane out of 2
Île d'Entrée - Cap-aux-Meules
199
Asphalting In Les Îles-de-la-Madeleine, between chemin du Vieux-Pont and chemin de la Pointe In both directions Alternating traffic, Monday to Friday between 7 am and 6 pm Lane width reduced to 3.5 metres
230
Maintenance In Saint-Pacôme, between Rue Grand'Maison and Rue King In both directions Alternating traffic, Monday and Tuesday between 7 a.m. and 5 p.m.
289
Bridge reconstruction In Rivière-Bleue, between Rang Saint-Hilaire and R-232 In both directions Alternating traffic on a detour route at all times
289
Public services In Pohénégamook, NORTH of the Vieux Chemin In both directions Road Closed Detours: Véhicules légers: Vieux Chemin Véhicules lourds: A-85, R-232
298
Maintenance Between rue Bélanger in Saint-Charles-Garnier and 5e Rang Ouest in Les Hauteurs In both directions Road closed, from Monday to Friday between 7:30 a.m. and 4 p.m. Detour: 5e Rang Ouest, Route du Portage, 7e Rang Ouest
299
Alternating traffic R-299 at height km 20, SOUTHBOUND and NORTHBOUND, Secteur Rivière-Bonaventure, undetermined period. Reason : Erosion.
299
Alternating traffic R-299 at height petit ruisseau Morency, SOUTHBOUND and NORTHBOUND, Secteur Rivière-Bonaventure, undetermined period. Reason : Erosion.
Asphalting In Les Îles-de-la-Madeleine, chemin du Bassin, between allée de la Butte-des-Picotte and chemin de l'Anse-à-la-Cabane In both directions Alternating traffic, Monday to Friday between 7 am and 6 pm Lane width reduced to 3.5 metres
Bridge repair In Marsoui, Route de la Rivière, on Rivière Marsoui Est bridge In both directions Alternating traffic at all times
Culvert replacement In Mont-Albert, on route du Lac-Sainte-Anne , on rivière des Béland bridge In both directions Alternating traffic at all times
Bridge construction In Percé, 6e Rang de Val-d'Espoir, on Rivière Murphy bridge In both directions Bridge closed at all times Detour: Route Lemieux, Chemin Val-d'Espoir
Bridge replacement In Percé, 6e rang de Val-d'Espoir, on Rivière Murphy bridge In both directions Bridge closed at all times Detour: Route Lemieux, Chemin de Val-d'Espoir, Route des Pères
Asphalt In Percé, Chemin Val-d'Espoir, between Route Lemieux and Route Lafontaine In both directions Alternating traffic, Monday to Friday between 7 a.m. and 6 p.m.
Drilling In Rivière-Bleue, rue des Peupliers Ouest, on the rivière Bleue bridge In both directions Alternating traffic
Bridge repairs In Rivière-du-Loup, Rue Saint-Magloire, between rue Témiscouata and rue Saint-Elzéar In both directions Road closed at all times Detour: R-191, A-85, rue Fraserville ou chemin des Raymond, R-191, R-291
Bridge repair In Rivière-Ouelle, access from Chemin du Haut-de-la-Rivière to A-20 WESTBOUND In both directions Access closed at all times Detour: R-132
Culvert repair In Rivière-Ouelle, Chemin du Haut-de-la-Rivière, on both sides of Chemin du Sud-de-la-Rivière In both directions Alternating traffic, Tuesday and Wednesday between 7 a.m. and 5 p.m.
Bridge reconstruction In Saint-Clément, on rue du Pont / petit 8e Rang, on the rivière Sénescoupé bridge In both directions Alternating traffic, Monday to Friday between 6:30 am and 7 pm
Road redevelopment In Sainte-Flavie, Chemin Perreault, at R-132 In both directions Temporary traffic stops for truck entry and exit - From Monday to Friday between 7 a.m. and 5 p.m.
Construction of a bridge In Sainte-Hélène-de-Kamouraska, route de l'Église Nord, on Rivière Goudron bridge In both directions Alternating traffic on a diverted road at all times
Bridge reconstruction In Sainte-Hélène-de-Kamouraska, on the rivière du Loup bridge, route du Pont-de-Broche In both directions Alternating traffic on a detour road at all times Lane width reduced to 5 metres
Culvert replacement In Sainte-Jeanne-D'Arc-de-la-Mitis, 3e rang de Massé at route Rochefort In both directions Roadway closed at all times Detour: route Rochefort, 4e et 5e rang de Massé, route du Portage
Drilling In Saint-Michel-du-Squatec, rue Saint-Marc, on the rivière Horton bridge In both directions Alternating traffic
Road resurfacing Between Sainte-Flavie and Mont-Joli, chemin Perreault, WEST of rue Industrielle In both directions - Alternating traffic at all times
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use