Back
Map
Road Conditions
Montérégie
10
In Brossard Eastern Townships Highway Exit 6 (A-15 S, Laprairie, Varennes) Eastbound Traffic on diverted and narrowed lanes at all times Lane width reduced to 3.5 meters including left shoulder of 0.50 meters and right shoulder of 2 meters Works: Construction of a multifunctional track
15
Saint-Bernard-de-Lacolle / Champlain
15
Restrictions at the Saint-Bernard-de-Lacolle border crossing in the northbound direction In Saint-Bernard-de-Lacolle The entry point of Saint-Bernard-de-Lacolle Northbound No lane closures Detour via the Lacolle port of entry via R-221 (across from the US port of entry in Overton Corners, NY) Restrictions: Non-standard vehicles in size having: more than 5 m high more than 2.6 m wide more than 23 m long NOTE: This notice does not apply to road trains with trailers 16.2 m long or less.
15
In Brossard Access ramp from R-132 East to A-10 East Westbound Closure of 1 lane out of 2 at all times Lane width reduced to 4 meters including 2 shoulders of 0,50 meters Works: Construction of a multifunctional track
20
In Brossard Access ramp from R-132 West, to A-10 East Westbound, Closure of 1 lane out of 2 at all times Lane width reduced to 4 meters including 2 shoulders of 0,50 meters Works: Construction of multifunctional track
20
Works: development of a reserved lane In Saint-Mathieu-de-Beloeil and Beloeil, between km 109 and 112 Contraflow traffic, 1 lane in each direction Sunday to Thursday, from 10 p.m. to 5:30 a.m. the next day From Friday 10 p.m. to Saturday 7 a.m. From Saturday 11 p.m. to Sunday 8 a.m. Track width: 4 meters Default, EASTBOUND: Exits 109 (rue Saint-Jean-Baptiste) and 112 (rue Richelieu, R-223) Detour: via exit 113 (R-133) Access rue Saint-Jean-Baptiste Detours: NORTHBOUND, via Chemin Trudeau and R-229 and SOUTHBOUND, via A-20 WEST and exit 105
25
In Montreal (arr. Mercier-Hochelaga-Maisonneuve) Tellier and Des Futailles Streets entrance to A-25 south Complete closure at all times Note: Des Futailles entrance is accessible for carpooling by 3 or more people Detours: From Des Futailles Street N/B: via rue Tellier E/B, De Boucherville Street S/B, Notre-Dame Street East W/B, Dickson Street N/B and Souligny Avenue E/B From Tellier Street W/B: via Des Futailles Street S/B
25
Between Longueuil and Montreal Louis-Hippolyte-La Fontaine Tunnel Closure of the NORTH tunnel Contraflow traffic in the SOUTH tunnel 2 lanes towards Montreal and 1 lane towards the South Shore Lanes height: SOUTH 3.8 meters and 3.2 meters North By default: closure of access from Île Charron to Montreal Clearance height: 4.3 m Works: repair of structures
30
Maintenance (patching) At La Prairie A-30 (Steel Highway) at the end of the entrance to Boulevard Jean-Leman In both directions Alternating traffic, between Wednesday 8 p.m. and Thursday 6 a.m. Closure of exit 58 (Jean-Leman) of the A-30 WEST At the same times Exit 47, R-132 EAST and continue to A-930 EAST
30
In Sorel-Tracy Boulevard des Érables At A-30 In both directions Contraflow traffic, 1 lane per direction, at all times Works: Repair of overpasses
30
In Sorel-Tracy Boulevard Tracy At A-30 In both directions contraflow traffic, 1 lane per direction, at all times
30
In Sorel-Tracy De l'Acier Highway Between exit 138 (Boulevard de Tracy) and Boulevard Saint-Louis In both directions Contraflow traffic on the eastbound roadway, 1 lane in each direction, at all times Works: Repair of overpasses
30
Works: Structural maintenance In Sorel-Tracy De l'Acier Highway On the bridge of Maurice-Martel From June 10 to 12 Westbound Closure of 1 lane out of 2 From Tuesday to Thursday, between 8 a.m. and 4 p.m. From June 16 to 18 Eastbound Closure of 1 lane out of 2 Monday to Wednesday, between 8 a.m. and 4 p.m.
40
In Vaudreuil-Dorion and Senneville Félix-Leclerc Highway In both directions On the bridge of Île-aux-Tourtes 2 lanes traffic at all times Speed limit reduction: 70 km/h ----- Heavy vehicles prohibited in the right lane, in either direction -- Overloaded vehicles prohibited
112
Between Montreal and Saint-Lambert On the Victoria Bridge ----- FRIDAY JUNE 13 : no peak hour configuration SATURDAY AND FRIDAY JUNE 14-15 : closure of the bridge WESTBOUND (towards Montreal) between 7 a.m. and 10:30 a.m. Traffic towards the South Shore only. ----- During the week during rush hours (Monday to Friday), BOTH lanes in ONE direction only: - From 5 a.m. to 9 a.m., towards Montreal (WESTBOUND) - From 3 p.m. to 7:15 p.m., towards the South Shore (EASTBOUND) Outside these hours, one lane open in each direction ----- NOTE: Heavy trucks prohibited at all times
116
Sir Wilfrid Laurier Boulevard Between the rang des Trente in Saint-Basilele-Grand And McMaster Street in McMasterville Eastbound Closure of 1 lane out of 2 at all times
132
In Kahnawake The access ramp from the R-132 West to the R-138 West Traffic on the diverted lane at all times
132
In Kahnawake The access ramp from R-138 east (coming from Châteauguay) towards La Prairie (R-132 east) In both directions Traffic on reduced lane at all times Lane width reduced to 4.5 metres Works: Structural maintenance
133
In Richelieu Patriots' Path Between the montée Daigneault and the Rang of Cinquante-Quatre In both directions Complete closure at all times Detour Coming from R-133 South (Richelieu) or A-10: Patriotes Road, Daigneault Hill. Savane Row. Fifty-Four Row. Patriotes Road Coming from R133 North (Saint-Jean-sur-Richelieu): Ch. des Patriotes, Fifty-Four row. Savannah row. Ch. des Patriotes Works: Reconstruction
133
In Saint-Ours Chemin des Patriotes Est South of Michaudville Road In both directions Alternating traffic at all times
133
Preventive closure In Saint-Ours Chemin des Patriotes Est North of the Chemin des Patriotes In both directions Alternating traffic at all times
Sorel-Tracy - Saint-Ignace-de-Loyola
202
Works: Asphalting In Clarenceville Between Front North Street and Parc de la Nature In both directions Alternating traffic Monday to Friday, between 7 a.m. and 6 p.m.
219
In Saint-Jean-sur-Richelieu Between Chemin du Clocher and Chemin du Petit-Bernier In both directions Alternating traffic at all times Works: Aqueduct and backflow
338
In Vaudreuil-Dorion Lotbinière Road Between Saint-Jean-Baptiste Avenue and Émond Street In both directions Complete closure at all times Detour Lotbinière Southbound: Émond Street, St-Jean-Baptiste Avenue, Lotbinière Road Lotbinière Northbound: St-Jean-Baptiste Avenue, Émond Street, Lotbinière Road Works: Paving the sidewalk
Works: Asphalting In Delson Rue Principale Sud Between Montée des Bouleaux and the R-132 In both directions Complete closure at all times Detour Westbound: boulevard Georges-Gagné Sud, montée des Bouleaux Eastbound : R-132 Est, demi-tour au chemin Saint-François-Xavier, R-132 Ouest, boulevard Georges-Gagné Sud, montée des Bouleaux
Works: Asphalting, marking Chemin de la Grande-Ligne Between Rang Saint-Joseph and Rang Saint-Henri In both directions Alternating traffic Monday to Friday, between 6 a.m. and 8 p.m. Lane width reduced to 4.2 meters
In Roxton Guilmain Road Between Runnels Creek and 5th Row Bridge over Runnels Creek In both directions Complete closure at all times Detour via 8e Rang Works: Preventive closure
Works: Sewers In Saint-Isidore-De-Laprairie Boyer Street West of Sainte-Anne Street In both directions Alternating traffic at all times
Closure delisle Road between old Chateauguay Road and river Road, SOUTHBOUND and NORTHBOUND, Kahnawake, undetermined period. Reason : Work site.
Closure old Chateauguay Road and Kirby Road, WESTBOUND and EASTBOUND, Kahnawake, undetermined period. Reason : Work Site.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use