Québec 511 > Titre

Titre

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 4, 2024
to April 12, 2024
Thaw period From March 18, 2024
to May 10, 2024
Thaw period From March 18, 2024
to May 17, 2024
Estrie
55  

From :  Stanstead, United States border

To : Sainte-Catherine-de-Hatley

Roadway
Bare and Dry
Visibility
Good
55  

From :  Sainte-Catherine-de-Hatley

To : Magog

Roadway
Bare and Dry
Visibility
Good
55  

From :  Sherbrooke

To : L'Avenir

Roadway
Bare and Dry
Visibility
Good
Mauricie—Centre-du-Québec
Continuation of major work on the Laviolette Bridge during weekends from mid-March, weather conditions permitting, until fall 2024. February 19, 2024
at 3:59 p.m.
Additional Information:
55  

From :  L'Avenir

To : Drummondville, Saint-Néciphore sector

Roadway
Bare and Dry
Visibility
Good
55  

From :  Drummondville, Saint-Néciphore sector

To : Junction of highways 20 and 55

Roadway
Bare and Dry
Visibility
Good
55  

From :  Sainte-Eulalie

To : Saint-Célestin

Roadway
Bare and Dry
Visibility
Good
55  

From :  Saint-Célestin

To : Laviolette Bridge in Bécancour

Roadway
Bare and Dry
Visibility
Good
55  

From :  Laviolette Bridge in Bécancour

To : Junction of highways 40 and 55

Roadway
Bare and Dry
Visibility
Good
55 
À Trois-Rivières et Bécancour, sur le pont Laviolette situé au-dessus du fleuve Saint-Laurent. Hindrance
Major
Direction
South and north
From 2024-03-05
to 2024-12-20
55  

From :  Junction of highways 40 and 55

To : Shawinigan Saint-Georges sector

Roadway
Bare and Dry
Visibility
Good
55 
À Shawinigan, à la hauteur du pont des Piles. Hindrance
Major
Direction
North
From 2023-07-17
to 2025-10-31