Québec 511 > Titre

Titre

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Thaw
Thaw period From March 4, 2024
to April 12, 2024
Thaw period From March 18, 2024
to May 10, 2024
Thaw period From March 18, 2024
to May 17, 2024
Abitibi-Témiscamingue
Closure Route Principale between R-109 and chemin de la Sablière, WESTBOUND and EASTBOUND, Authier-Nord, undetermined period, detour on local network. Reason : Flooding. April 20, 2024
at 7:13 a.m.
Closure chemin de Pénétration at height chemin du Lac-Moran, SOUTHBOUND and NORTHBOUND, Béarn, undetermined period, detour R-391, chemins des 7 ième et 1 rangs, chemin des Quinze, rang 6 ième. Reason : Flooding. April 15, 2024
at 3:34 p.m.
393  

From :  Junction of routes 101 and 393

To : Duparquet

Roadway
Bare and Dry
Visibility
Good
393  

From :  Duparquet

To : Palmarolle

Roadway
Bare and Dry
Visibility
Good
393  

From :  Palmarolle

To : La Sarre

Roadway
Bare and Dry
Visibility
Good