Québec 511 > Road Conditions > By Region and by Road > Route 327

Route 327

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.

Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.

Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Thaw
Thaw period From March 4, 2024
to April 12, 2024
Thaw period From March 18, 2024
to May 10, 2024
Thaw period From March 18, 2024
to May 17, 2024
Laurentides—Lanaudière
Continuation of major work on the Laviolette Bridge during weekends from mid-March, weather conditions permitting, until fall 2024. February 19, 2024
at 3:59 p.m.
Additional Information:
327  

From :  Junction of highway 50 and route 327

To : Junction of routes 148, 327 and rue Principale

Roadway
Bare and Dry
Visibility
Good
327  

From :  Junction of routes 148 and 327 à Lachute

To : Brownsburg-Chatham

Roadway
Bare and Dry
Visibility
Good
327  

From :  Brownsburg-Chatham

To : Montcalm, Weir sector

Roadway
Bare and Dry
Visibility
Good
327  

From :  Montcalm, Weir sector

To : Mont-Tremblant

Roadway
Bare and Dry
Visibility
Good