Route 202

Road Conditions
Roadway
Bare (dry or wet)
Partly snow covered, snow packed
or ice covered
Snow covered, snow packed
or ice covered
Visibility
Good
Fair
Poor
Roadwork
Minor hindrance
Major hindrance
Other informations
Warning
Trucks prohibited
Ferry
Border crossing
Current Warnings
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.

Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.

Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
February 15, 2024
at 12:29 p.m.
Thaw
Thaw period From March 4, 2024
to April 26, 2024
Thaw period From March 18, 2024
to May 10, 2024
Thaw period From March 18, 2024
to May 10, 2024
Montérégie
Continuation of major work on the Laviolette Bridge during weekends from mid-March, weather conditions permitting, until fall 2024. February 19, 2024
at 3:59 p.m.
Additional Information:
Slow-moving traffic A-20 towards A-10 east, direction Sherbrooke, traffic on diverted lanes and lane width at 3.9 meters., WESTBOUND, undetermined period. Reason : Work planned later. February 15, 2024
at 10:17 a.m.
Slow-moving traffic A-20 Towards A-10 west, direction Montreal, traffic on diverted lanes, lane width reduced to 3.9 meters., WESTBOUND, Brossard, undetermined period. Reason : Work planned later. February 15, 2024
at 10:14 a.m.
202 
Closure R-202 between A-15 and R-217, WESTBOUND and EASTBOUND, Saint-Bernard-de-Lacolle, undetermined period, detour Via le rang Saint-André (R-217), montée Guay, A-15. Reason : Roadwork. March 27, 2024
at 4:43 p.m.