Québec 5-1-1

Route  
132

Québec 511 > New Road Work Sites > Added since the last 48 hours
Road Conditions Roadway Bare (Dry or Wet) Partly (Snow Covered, Snow Packed or Ice Covered) Snow Covered, Snow Packed or Ice Covered Visibility Good Fair Poor Roadwork Minor Hindrance Major Hindrance Current warnings Trucks Prohibited Ferry Border Crossing

Montérégie
132  

From :  Salaberry-de-Valleyfield

To : Beauharnois

Roadway
Bare and Wet
Visibility
Good
132  

From :  Beauharnois

To : Châteauguay

Roadway
Bare and Wet
Visibility
Good
132  

From :  Honoré-Mercier Bridge Rive-Sud

To : Candiac

Roadway
Bare and Wet
Visibility
Good
132  

From :  Sorel-Tracy

To : Saint-Gérard-Majella

Roadway
Partly Snow Covered
Visibility
Good
Chaudière-Appalaches
132 
Closure R-132 between rue Pouliot and rue Lauzé, WESTBOUND and EASTBOUND, Sainte-Croix, undetermined period, detour on local network. Reason : Roadwork. December 12, 2017
at 8:01 a.m.
132  

From :  Junction of routes 132 and Lallemand in Lévis

To : Saint-Vallier

Roadway
Snow Covered
Visibility
Good
132  

From :  Saint-Vallier

To : Junction of routes 132 and 283 in Montmagny

Roadway
Partly Snow Covered
Visibility
Good
L'Isle-aux-Grues - Montmagny Service:
Closed
132  

From :  Junction of routes 132 and 283 in Montmagny

To : L'Islet

Roadway
Snow Covered
Visibility
Good
132  

From :  L'Islet

To : Sainte-Anne-de-la-Pocatière

Roadway
Snow Covered
Visibility
Good
Bas-Saint-Laurent-Gaspésie-Îles-de-la-Madeleine
132  

From :  Sainte-Anne-de-la-Pocatière

To : Kamouraska

Roadway
Partly Snow Packed
Visibility
Good
132  

From :  Kamouraska

To : Rivière-du-Loup Saint-Patrice sector

Roadway
Partly Snow Packed
Visibility
Good
132  

From :  Junction of highway 20 and route 132 in Rivière-du-Loup

To : Trois-Pistoles, route de Notre-Dame-des-Neiges

Roadway
Bare and Wet
Visibility
Good
Rivière-du-Loup - Saint-Siméon Service:
Closed
132  

From :  Trois-Pistoles, route de Notre-Dame-des-Neiges

To : Saint-Simon

Roadway
Bare and Wet
Visibility
Good
132  

From :  Saint-Simon

To : Rimouski Le Bic sector

Roadway
Partly Snow Packed
Visibility
Good
132 
Closure R-132 between Bic and Trois-Pistoles, WESTBOUND and EASTBOUND, Rimouski, undetermined period. Reason : Roadway departure. December 15, 2017
at 5:09 p.m.
132  

From :  Rimouski Rimouski-Est sector

To : Sainte-Flavie

Roadway
Partly Snow Covered
Visibility
Good
132  

From :  Mont-Joli

To : Baie-des-Sables

Roadway
Partly Snow Covered
Visibility
Good
132  

From :  Baie-des-Sables

To : Matane

Roadway
Partly Snow Packed
Visibility
Good
132  

From :  Matane

To : Les Méchins

Roadway
Partly Snow Packed
Visibility
Good
132  

From :  Les Méchins

To : Sainte-Anne-des-Monts

Roadway
Snow Covered
Visibility
Good
132  

From :  Sainte-Anne-des-Monts

To : L'Anse-Pleureuse

Roadway
Snow Covered
Visibility
Good
132  

From :  L'Anse-Pleureuse

To : Sainte-Madeleine-de-la-Rivière-Madeleine

Roadway
Bare and Wet
Visibility
Good
132  

From :  Sainte-Madeleine-de-la-Rivière-Madeleine

To : Cloridorme

Roadway
Bare and Dry
Visibility
Good
132  

From :  Cloridorme

To : Gaspé Rivière-au-Renard sector

Roadway
Bare and Dry
Visibility
Good
132  

From :  Gaspé Rivière-au-Renard sector

To : Gaspé Saint-Majorique sector

Roadway
Bare and Dry
Visibility
Good
132  

From :  Gaspé Saint-Majorique sector

To : Downtown Gaspé

Roadway
Bare and Dry
Visibility
Good
132  

From :  Gaspé Haldimand sector

To : Gaspé L'Anse-à-Brillant sector

Roadway
Bare and Dry
Visibility
Good
132  

From :  Gaspé L'Anse-à-Brillant sector

To : Percé Coin-du-Banc sector

Roadway
Bare and Dry
Visibility
Good
132  

From :  Percé Coin-du-Banc sector

To : Percé L'Anse-à-Beaufils sector

Roadway
Partly Ice Covered
Visibility
Good
132  

From :  Percé L'Anse-à-Beaufils sector

To : Chandler Newport sector

Roadway
Bare and Dry
Visibility
Good
132  

From :  Chandler Newport sector

To : New Richmond

Roadway
Bare and Dry
Visibility
Good
132  

From :  New Richmond

To : Nouvelle

Roadway
Bare and Dry
Visibility
Good
132 
R-132 closed at Cascapédia - Saint-Jules, WESTBOUND and EASTBOUND, at the height of Cascapédia River. Reopening on June 2018. Detour over than 11 km : Follow traffic sign on site. Reason: Broken structure. For vehicles over 3.5 meters wide, contact Centre de services of New Carlisle for the alternate route. October 17, 2017
at 12:06 p.m.
132  

From :  Nouvelle

To : Matapédia

Roadway
Partly Ice Covered
Visibility
Good
132  

From :  Matapédia

To : Amqui

Roadway
Partly Snow Packed
Visibility
Good
132  

From :  Amqui

To : Sayabec

Roadway
Partly Snow Packed
Visibility
Good
132  

From :  Sayabec

To : Mont-Joli

Roadway
Partly Snow Covered
Visibility
Good
Top of the page.