Québec 5-1-1

Worksite in Detail

 
     
Hindranceminor (weekday and weekend) Start:
End:
Update:
2019-07-02
2019-08-08
June 28, 2019 at 9:18 a.m.

Direction(s): In both directions
Location: À L'Ascension-de-notre-Seigneur, sur le pont au-dessus de la rivière Mistouk
Work Type: Entretien (pont)
Hindrance: Circulation en alternance en tout temps
Details: Limite de vitesse: 50 km/h
Hindrances Related to Load and Size: Largeur de voie: 3 m


Top of the page.