Back
Map
Road Conditions
Current Warnings
Louis-H.-La Fontaine Tunnel
Contraflow traffic (north tube), 2 lanes northbound and only one southbound.
Northbound lanes width reduced to 3.2 m. Cause: tunnel repair.
Heavy vehicles:
Coming from A-20 West/A-25 North (towards Montréal), right lane MANDATORY from De Mortagne Blvd.
Coming from A-25 South (towards Longueuil), right lane PROHIBITED from Sherbrooke Street.
Thaw period
Mauricie—Centre-du-Québec
Continuation of major work on the Laviolette Bridge during weekends from mid-March, weather conditions permitting, until fall 2024.
349
From:
Louiseville
To:
Saint-Paulin
349
In Saint-Alexis-des-Monts, at the Allard bridge, located above the Loup river. In both directions From Monday April 8, 2024 to Friday July 11, 2025. Alternating traffic, at all times. Lane width reduced to 4 meters.
Current Warnings
Road Conditions
Traffic Cameras
Who can consult this page?
Français
Terms of use